73-87 Chevy _ GMC Trucks > Fuel Systems and Drivability

Out with the old, in with the new

(1/2) > >>

Chanman09:
Spent the long weekend getting the new tank and sending unit ready to install.  Took off the bolts to the bed in order to raise it and only had to cut one nut off and ruined one bolt in the process.  I have the new carriage bolt and nut on the way and will probably get this little project marked off the list soon. 

Mike81K10:
Way to go!

ehjorten:
Curious as to how the foam strips will last. GM used heavy weight tar paper. When I redid mine I just cut strips of #40 asphalt felt paper to match the factory. When you buy the replacement stuff it is essentially the same, though it may be a bit lighter weight.

Shifty:
 8)

Mike81K10:
Will last until you remove the tanks again.

Navigation

[0] Message Index

[#] Next page

Go to full version