Ahh ok yeah I kind of see it in that picture thanks. My floor pan rust through a little bit on the very edge where it meets with the rocker, so I am going to fabricate a piece of sheet metal to weld into that spot(its only like a 3.5-4 inch spot on that edge below the main part of the floor) so that first flange is going to be welded underneath the floor pan correct?